Sunday 25 September 2011

engine update

The engineer came and it is a workshop job as it is either the coil or
computer. As we were tied to the bank half way between stops and
opposite the road we decided to move Mango back to the stop where the
engineers workshop is. We found that as the tow path here is in very
good condition and cleared of bushes it is relatively easy (and faster
than paddling) to move Mango by one of us pulling her along using long
bow and stern warps. We lucked out though as a British canal boat who
was going in the same direction offered us a tow to our objective which
have the time it would have taken, especially as there were a couple of
sections where we would have had to paddle.

No comments:

Post a Comment